Petro-Hunt, LLC Silurian 39-1 and Silurian 54-1 Saltwater Replacement Pipeline
This project will replace two existing saltwater pipelines for Petro-Hunt located within the existing Charlson Oil Field. The existing lines are aged and are at risk of failure.
Project Summary
Location Summary:
Approximately 25 air miles northeast of Watford City, ND
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 10/16/2012 |
| Comment Period | 10/18/2012 |
| Decision | 04/2013 (Estimated) |
| Implementation | 06/2013 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.3 (3)
Special Authority:
Oil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390)
Lead Management Unit:
Mckenzie Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Minerals And Geology
Project Activity:
Natural Gas; Oil
Current Status:
Completed
Project Decision Information
Decision Memo For Petro-Hunt, LLC Silurian 39-1 and Silurian 54-1 Saltwater
Decision Signed Date: 04/24/2013
Legal Notice Date: 04/30/2013
Forests:
Dakota Prairie Grasslands
Districts:
Mckenzie Ranger District
States:
North Dakota
Counties:
McKenzie
Legal Land Description:
Sections 7, 17, & 18, T153N, R95W, McKenzie County, ND
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Justin Hartel
1905 Main St. South
Watford City, ND 58854-6705
701-842-2393
jhartel@fs.fed.us
Last Updated: 5/6/2013