Skip to main content

Whiting Oil and Gas BSMU 2410 Flowline Extension

Proposal to extend an existing sement of line within the same trenches as the BSMU 1302 line replacement. Approximately 2,400 ft. of high pressure 3 inch fiberglass line

Project Summary

Last Updated: 7/15/2014