True Oil, LLC 21-16-16-21H Pipeline Project
Construction of a 4 inch poly natural gas pipeline, a 4 inch flex steel salt water pipeline, and a 4 inch poly fresh waterline paralleling each other and a recently approved crude oil pipeline.
Project Summary
Location Summary:
McKenzie County, North Dakota. Located on the west side of the McKenzie Ranger District, south of Highway 68.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 12/11/2013 |
| Decision | 02/2014 (Estimated) |
| Implementation | 03/2014 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.3 (3)
Special Authority:
Oil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390)
Lead Management Unit:
Dakota Prairie Grasslands All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
True Oil, Three Paralleling Lines For 21-16-16-21H Well Site
Decision Signed Date: 02/26/2014
Forests:
Dakota Prairie Grasslands
Districts:
Mckenzie Ranger District
States:
North Dakota
Counties:
McKenzie
Legal Land Description:
Sec 17, 148N, R100W, 5th PM, McKenzie County, North Dakota
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Kim Grotte
2000 Miriam Circle
Bismarck, ND 58501
701-842-2393
kgrotte@fs.fed.us
Last Updated: 6/27/2014