Skip to main content

Galena Summer Trails (non-motorized) Project

Develop a 60 mile non-motorized trail system in the Galena Lodge area; 36 miles would be new trail construction; the remaining 24 miles would utilize existing routes. The trail system would provide a mix of difficulties.

Project Summary

Last Updated: 9/27/2013